The flow a fire service has to deliver — hydrant demand to AS 2419.1, sprinkler demand to AS 2118.1, and the two added together
The flow a fire service must deliver is not one figure. A hydrant demand and a sprinkler demand are each derived by their own Standard, from different inputs, and then added together because a brigade will not isolate the sprinklers while it uses the hydrants.
| Demand | Set by | Driven by |
|---|---|---|
| Hydrant | AS 2419.1:2021 Cl 2.2.5 and 2.2.6 | NCC class, fire compartment floor area, sprinkler protection, effective height → number of outlets. Supply arrangement → flow and pressure per outlet. |
| Sprinkler | AS 2118.1:2017 Cl 9.2, 10.2, 11.3 — or AS 2118.4:2012 Cl 4.3 | Hazard classification → number of operating heads and flow per head. |
| Combined | AS 2118.1:2017 Cl 4.3.1(c) and (d); AS 2419.1:2021 Cl 2.2.7 | Hydrant demand plus sprinkler demand, simultaneously, at the required pressures. |
Counted on the fire compartment floor area, not the whole building. Note the two separate ladders for non-sprinkler buildings — classes 2, 3, 5 and 9 change threshold with the rise in storeys, while classes 6, 7 and 8 do not.
| Building | Fire compartment area, m² | Outlets |
|---|---|---|
| Non-sprinkler — 2, 3, 5, 9 (rise in storeys ≤ 2) | ≤ 1 000 | 1 |
| > 1 000 to 5 000 | 2 | |
| Non-sprinkler — 2, 3, 5, 9 (rise in storeys > 2) | ≤ 500 | 1 |
| > 500 to 5 000 | 2 | |
| Non-sprinkler — 6, 7, 8 | ≤ 500 | 1 |
| > 500 to 5 000 | 2 | |
| Non-sprinkler — all classes | > 5 000 to 10 000 | 3 |
| All classes | > 10 000 | 3, plus 1 for each extra 5 000 m² or part |
| Sprinkler protected — effective height ≤ 25 m | ≤ 1 000 | 1 |
| > 1 000 to 10 000 | 2 | |
| > 10 000 | 3 | |
| Sprinkler protected — effective height > 25 m | ≤ 5 000 | 2 |
| > 5 000 | 3 |
Open-deck car parks use Table 2.2.5(C) and the floor area of the largest single storey; open yards use Table 2.2.5(D) and the yard area. The printed tables use strict inequalities, so a value sitting exactly on a boundary is covered by neither line — this tool takes the higher outlet count at a boundary and tells you when it has done so.
| Supply arrangement | Table | L/s per outlet | Residual — NSW | Residual — other |
|---|---|---|---|---|
| External feed or attack/feed, reticulated, unassisted | (A) | 10 | 150 kPa | 200 kPa |
| External or internal attack, reticulated, unassisted | (B) | 10 | 250 kPa | 350 kPa |
| Attack, on-site half-duty pump (≤ 50 m effective height) | (C) | 5 | 700 kPa | 700 kPa |
| Attack, on-site full-duty pump (> 50 m effective height) | (D) | 10 | 700 kPa | 700 kPa |
| Internal attack, gravity break tank | (E) | 10 | 700 kPa | 700 kPa |
| Internal and external attack, brigade boosted | (F) | 10 | 700 kPa | 700 kPa |
Minimum required flow = flow per outlet × outlets required to flow simultaneously, delivered for not less than four hours (Cl 2.2.6). The 5 L/s in Table (C) is a concession specific to half-duty pumps: it lets the brigade start attacking before the system is boosted.
| Hazard | Heads operating | Flow per head | Clause |
|---|---|---|---|
| Light Hazard (offices, schools, hospitals, residential portions) | 6 | ≥ 70 kPa each, K80 → 66.9 L/min | Cl 9.2(a) |
| OH1 | 6 | ≥ 60 L/min | Cl 10.2.1, Table 10.2.2 |
| OH2 (shops, car parks, engineering) | 12 | ≥ 60 L/min | Cl 10.2.1, Table 10.2.2 |
| OH3 | 18 | ≥ 60 L/min | Cl 10.2.1, Table 10.2.2 |
| OH3 Special | 30 | ≥ 60 L/min | Cl 10.2.1, Table 10.2.2 |
| HH — process | density × area | per Table 11.3.4.3 | Cl 11.3.4.3 |
| Residential (AS 2118.4, ≤ 4 storeys) | ≤ 4 | ≥ 60 L/min, total ≥ 200 L/min | Cl 4.3.2, 4.3.3 |
Light Hazard is expressed as a pressure, not a flow — the flow follows from the head's K factor. At the minimum K of 8.0 and the minimum 70 kPa, one head passes 80 × √0.7 = 66.9 L/min. A larger-K head raises the demand, so this is the floor, not a cap.
The calculator works either way — tick or clear the sprinkler box. This table is here so the answer to “is it even sprinkler protected?” is on the same page as the flow it creates.
| NCC | Trigger |
|---|---|
| E1D5 | Any class — effective height more than 25 m, throughout the whole building (open-deck car park within a multi-classified building included) |
| E1D6 | Class 2 or 3 — rise in storeys of 4 or more and effective height not more than 25 m |
| E1D7 | Class 3 used as a residential care building — throughout |
| E1D8 | Class 6 — fire compartment more than 3 500 m² or more than 21 000 m³ |
| E1D9 | Class 7a other than open deck — more than 40 vehicles |
| E1D10 | Class 9a used as residential care, and Class 9c — throughout |
| E1D11 | Class 9b — early childhood centre, with the exemptions in E1D11 |
| E1D13 | Occupancies of excessive hazard — compartment more than 2 000 m² or 12 000 m³ |
—
Each figure in the result traces to one of these. Where a Standard is silent — boundary values, or a demand it cannot set from the inputs given — the tool says so rather than filling the gap.
| Reference | What it fixes | Where it is applied |
|---|---|---|
| AS 2419.1:2021 Cl 2.2.5 Table 2.2.5(B) | Number of hydrant outlets that must flow simultaneously, from the fire compartment floor area, NCC class, sprinkler protection and effective height | Outlet count |
| Table 2.2.5(C) | Open-deck car parks — largest single storey, not the largest compartment | Outlet count, class 7a open deck |
| Table 2.2.5(D) | Open yards — yard area | Outlet count, open yard |
| AS 2419.1:2021 Cl 2.2.6 Tables 2.2.6(A)–(F) | Flow and residual pressure per outlet, by supply arrangement and jurisdiction; four-hour duration | Hydrant L/s and kPa |
| AS 2419.1:2021 Cl 2.2.7 | Sprinkler and hydrant systems on a common source must operate simultaneously | Combined demand |
| AS 2419.1:2021 Cl 2.2.8 | Class 7a without a car stacker, sprinkler protected throughout — simultaneous flow not applicable; highest-demand system governs | Combined demand exception |
| AS 2118.1:2017 Cl 4.3.1(c), (d) | Town main must supply hydrant flow and sprinkler demand together, at the required pressures | Combined demand |
| AS 2118.1:2017 Cl 4.3.1(e) | Where only a car-parking compartment is protected, no simultaneous hydrant flow is added | Combined demand exception |
| AS 2118.1:2017 Cl 9.2(a) | Light Hazard — 70 kPa at each of the six most hydraulically unfavourable heads | LH flow |
| AS 2118.1:2017 Cl 10.2.1 | Ordinary Hazard — at least 60 L/min from each head in the design area | OH flow per head |
| AS 2118.1:2017 Table 10.2.2 | Heads in the most unfavourable array — OH1 6, OH2 12, OH3 18, OH3 Special 30 | OH head count |
| AS 2118.1:2017 Cl 10.2.3 and Table 10.2.3 | Sloping roofs over 6° and bays 9 m wide or less — OH1 8, OH2 15, OH3 24, OH3 Special 36. Light and High Hazard unchanged | OH head count on sloping roofs |
| AS 2118.1:2017 Cl 11.3.4.3 and Table 11.3.4.3 | High Hazard process — design density and design area | HH flow |
| AS 2118.1:2017 Appendix A | Occupancy classification — which NCC occupancies sit in LH, OH1–3, OHS | Suggested hazard |
| AS 2118.4:2012 Cl 1.1, 4.3.2, 4.3.3 | Residential systems for accommodation up to four storeys — four heads maximum, not less than 200 L/min total | Residential flow |
| AS 2118.6:2012 Cl 2.1, 2.8.1 | Combined sprinkler and hydrant systems — comply with AS 2118.1 for sprinklers and AS 2419.1 for hydrants | Combined systems |
| NCC 2022 Vol 1 E1D5–E1D13 | When sprinklers are required, by class, height, rise in storeys and compartment size | Requirements tab |